Enterprise Flood Plans & Supplies for Flood Season
Every flood season, some enterprises lose a workshop, soak their equipment and halt production in a single rainstorm — because they made no plan and stocked no supplies. Flood control is not about rushing when the rain comes; it is about writing the plan, stocking the supplies and assigning people before flood season. This article explains how an enterprise writes a flood plan and stocks supplies before the season.
Plan First: What a Flood Plan Should Contain
An enterprise flood plan is drawn up mainly on the basis of the Water Law of the People's Republic of China, the Flood Control Law of the People's Republic of China and the National Flood Control and Drought Relief Emergency Plan, together with the enterprise's own production safety accident emergency plan. The plan need not be long, but the key contents must not be missing.
Organisation and responsibilities: set up a flood control leading group, with a leader, deputy leaders and the responsibilities of each team spelled out. The rescue team handles plugging leaks and drainage, the supplies team handles purchasing, stocking and issuing supplies, the logistics team handles food, lodging and transport for rescue personnel, and the communications team handles passing information up and down. Every post must have a named person in charge and contact details.
Risk-point survey: before writing the plan, walk the site and find the key points — low-lying areas, basements, power distribution rooms, warehouses and drainage outlets. Which places flood most easily? Which equipment fears water most? Which supplies must be moved first? Write these into the plan, so rescue follows the map.
Early warning and response: spell out the actions for each warning level. After a rainstorm warning, who patrols the drainage system? At what rainfall do you start the emergency response? When do you stop production and evacuate people? The response procedure must be specific down to people and times — not just the four words "strengthen duty watch".
The plan must be drilled and revised regularly. Organise at least one flood drill before flood season to test whether the plan works in practice, and revise the plan promptly for problems found in the drill. A plan is not a document to be written and locked in a cupboard — everyone involved must know their own duties.
Pre-Season Checks: Drainage Systems and Low-Lying Points
Pre-season checks are the first step of flood preparation, and should be finished one month before flood season starts.
Drainage systems: clear the drains, rainwater wells and pipes inside and outside the site, removing silt and debris; check that drainage pumps start normally and that backup pumps are intact; check the drainage facilities of underground car parks and basements carefully, and test the water-level alarm in the sump pits.
Low-lying point protection: at the entrances of basements, power distribution rooms and warehouses — the low-lying points — prepare flood barrier boards or sandbags in advance and install them before flood season, rather than looking for them when the water comes. Move important equipment and archives to high ground, or store them raised up.
Roofs and exterior walls: check that roof drains are not blocked and waterproofing is not damaged; check that the seals on exterior doors and windows are intact; check that outdoor billboards and temporary structures are firm, and reinforce or remove them before typhoon season.
Electrical safety: power distribution rooms, transformers and cable trenches need priority protection against rainwater flowing back; during flood season arrange dedicated patrols of electrical facilities, and cut power promptly when water is found, to prevent electric shock accidents.
Stocking Supplies: Blocking, Drainage, Rescue and Repair
Flood supplies are stocked in four groups, ready before flood season, stored at fixed points and managed by a named person.
Blocking: flood sandbags, water-activated flood bags, modular flood barrier boards and waterproof sheeting. Fill sandbags in advance and stack them near low-lying points — do not wait for the rain to start filling sand; flood barrier boards must be custom-made to the doorway size in advance, and the installation method must have been drilled.
Drainage: submersible sewage pumps, generators, drainage pipes and hoses. Test-run drainage pumps regularly so they start normally in flood season; keep enough fuel for the generator so pumps keep working during a power cut; hoses must be long enough to reach from the flooded point to the drain outlet.
Rescue: life jackets, life rings, life ropes and rubber boats (where affordable). Enterprises on low-lying ground or beside rivers and lakes should stock these as a priority; life jackets must be stocked by the number of rescue personnel — several people must not share one jacket.
Repair: shovels, picks, torches, raincoats, rain boots, walkie-talkies and first aid kits. The basic kit for rescue personnel must be issued as a set, within easy reach during flood-season duty.
Quantities are set by site area, the number of low-lying points and the size of the rescue team. For the detailed flood supplies list, see our Flood Control Supplies Checklist for Businesses.
Warning Response: Graded Action by Rainfall
Warning response must follow the weather department's warning signals. Rainstorm warning signals come in four levels — blue, yellow, orange and red. Blue is the lowest level, meaning rainfall will reach 50 mm or more within 12 hours, or has already reached 50 mm and may continue. The higher the level, the stronger the rainfall, and the response measures must escalate accordingly.
Blue and yellow warnings: start duty patrols, check the drainage system and low-lying point protection, and confirm that flood supplies are in place and drainage pumps work. Rescue teams stand by and communications stay open.
Orange and red warnings: start the emergency response, rescue teams take up their posts, move people out of low-lying areas, cut power to protect important equipment, and close off basements and underground car parks. Where necessary, stop production and work, and evacuate people to safe areas.
Do not relax after the rain either. After a rainstorm, check the site for damage promptly — whether the drainage system is blocked, whether electrical equipment is damp, how much flood supplies were used and what needs topping up. After flood season, count the flood supplies, dry them and store them away for next time.
Frequently Asked Questions
How often should an enterprise flood plan be revised?
At least once a year before flood season. Revise promptly whenever the site layout, equipment or personnel change. After every flood drill and every real flood response, revise the plan based on the problems exposed.
Should flood sandbags be filled in advance or filled when needed?
Fill them in advance. Filling sandbags during a rainstorm is too late, and sand and labour may not be available. Fill sandbags before flood season, stack them near low-lying points and cover them with waterproof sheeting; water-activated flood bags are lighter and expand automatically when wet, suiting enterprises with no sand supply.
Do drainage pumps need maintenance in normal times?
Yes. A drainage pump left unused for a long time rusts and seizes, and will not start in flood season. Run it for a test once a month, checking the power supply, impeller and seals; do a full check before flood season to confirm it works normally. Maintain backup pumps the same way.
What if a small enterprise has no full-time flood team?
It can form a part-time rescue team drawn from various departments, on rotating duty during flood season; or it can join forces with neighbouring enterprises and the community, sharing supplies and teams. The key point is that the plan must state clearly who is responsible for what, with contact details that work — when something happens, you must be able to reach someone.