Category: Labor Protection Supplies

PPE Goods Inspection Checklist: Accepting Deliveries

When PPE arrives, whether to inspect it before signing, what to check and how to check it — many companies have no fixed process. Goods go straight into the warehouse and out to workers, and only when a problem occurs do they find the model is wrong, the report is expired, or the goods are even fake. This guide gives an acceptance checklist to follow — inspect first, then put goods into stock.

Three Steps of Acceptance: Order, Certificates, Goods

Step one is the order. Check the purchase contract and delivery note item by item: product name, model, specification, quantity and size distribution — do they match the order? A model wrong by one letter can mean completely different protection; wrong size distribution means workers cannot wear the goods. Count the quantity for real — do not rely only on the numbers printed on the outer packaging.

Step two is the certificates. Check the documents that come with the goods: the product certificate of conformity, the test report and the safety mark certificate for special labour protection articles. The model, manufacturer and standard number on the test report must match the delivered product, the report must be within its validity period, and the measured values of key items must be listed — not just the word "pass". For special labour protection products, also check the LA mark and certificate number, verifying the number, company, category and validity period through the official channels.

Step three is the goods. Spot-check the actual products: appearance, markings, workmanship and sizes. Markings must be clear and durable, covering at least the standard number, manufacturer name, production date, model and specification. There must be no damage, deformation, glue failure or cracking in appearance. Spot checks should cover different sizes and different batches — do not check only the top box.

Acceptance Points by Category

Head protection: safety helmets follow GB 2811-2019 — check impact absorption, penetration resistance, complete markings and production date. The inside of the shell should carry a permanent mark; treat missing or blurred items with caution. Since September 2024, safety helmets have come under industrial product production licence management, so the production licence number can be checked when buying.

Respiratory protection: particulate respirators follow GB 2626-2019 — check the KN class and filtration efficiency; gas masks follow GB 2890-2022 — check the filter cartridge's target substances and validity period. Filter cartridges and filter cotton are consumables — check their validity periods, as an expired filter cartridge gives no protection.

Hand protection: general protective gloves follow GB 42298-2022, mechanical-hazard gloves follow GB 24541-2022 — check the four grades of abrasion, cut, tear and puncture resistance; chemical protective gloves follow GB 28881-2023 — check the material and the permeation grade, and which substances it resists.

Foot protection: safety shoes follow GB 21148-2020 — check the impact protection grade, 1100 N puncture resistance and slip resistance grade. The toecap must not be deformed, the sole must not be coming apart or cracked, and the protection symbols in the marking must match what the contract agreed.

Body protection: flame-retardant clothing follows GB 8965.1-2020, anti-static clothing follows GB 12014-2019, and chemical protective clothing follows GB 24539-2025. For clothing, also check the hang tag: safety category, fibre content, size and instructions for use — treat missing items with caution.

Fall protection: safety harnesses follow GB 6095-2021 — check the webbing, buckles and hooks for damage or deformation, and whether the markings are complete. A safety harness is a life-saving item — even a small appearance problem cannot be tolerated.

How to Check a Test Report

Look at the issuing body of the report: only reports from testing bodies with CMA and CNAS accreditation carry authority, and the report number can be verified on the National Certification and Accreditation Information Public Service Platform. The product name, model, manufacturer, standard number, test items, test results and test date on the report must all be complete. A report with a very old test date, incomplete test items, or results that only say "pass" with no values should have its credibility marked down.

Also watch the match between report and goods: one report covers one model and one batch — a report for model A cannot be used to accept goods of model B. If the supplier changes the manufacturer or the model, a new report must be provided.

How to Handle Non-Conforming Goods

If acceptance finds non-conforming goods, first seal the whole batch — do not issue while inspecting, and do not pick out the good ones and send them first. Take photographs as evidence, write an acceptance record, and notify the supplier to replace or take back the goods; replacement goods must be inspected again. Both sides sign the acceptance record and keep it on file, so there is evidence if a dispute arises.

Acceptance standards and rejection rules are best written into the purchase contract: sampling rate, pass/fail criteria and handling of non-conforming goods. If the contract does not state them, disputes at acceptance are far more likely.

Frequently Asked Questions

Must small deliveries be inspected too?

Yes. Small batches are easier to inspect in full, and the cost is low. PPE concerns worker safety, so no matter how small the batch, acceptance cannot be skipped.

The test report has expired — can the goods still be accepted?

No. An expired report says nothing about the performance of this batch. Ask the supplier for a report within its validity period, or send the goods for retesting, and only accept them once the report arrives.

Spot checks found a problem with one pair of shoes — must the whole batch be returned?

First, double the sample for re-inspection. If problems remain after the doubled sample, reject the whole batch; if the doubled sample is clean, only the faulty part can be returned. The exact decision rule follows the purchase contract.

How long should acceptance records be kept?

Keep them at least until the whole batch of products has been retired. Acceptance records are evidence that the company fulfilled its acceptance duty, and may be needed for inspections, claims and dispute handling.

WhatsApp 18300232331 Get a Free Quote
Chat Get a Quote